1. What joints are used in the construction process to separate two concrete pours?
A) Expansion
B) Isolation
C) Control
D) Construction
2. A civil engineering technologist asked an engineer in training (EIT) to write a deficiency report. After a few revisions, the report is still disorganized and has errors. What would be an appropriate action to take for the technologist?
A) Assist the EIT in re-writing the report.
B) Explain to the EIT the importance of meeting deadlines.
C) Report the EIT to the supervisor and recommend training.
D) Complete the document on behalf of the EIT.
3. Which of the following situations would cause the most serious delay on a project?
A) A severe storm flooded a trench before it could be backfilled.
B) Several bones, ranging in size from 10 cm to 60 cm, were found during excavation operations.
C) A worker suffered a broken arm on the work site.
D) A gas service line to a residence was hit, causing the line to rupture.
4. Which of the following is employee's responsibility in regard to PPE?
A) Receive training on the correct use of PPE.
B) Select PPE appropriate for the hazard.
C) Ensure PPE is maintained correctly between uses.
D) Inspect PPE before use.
5. A civil engineering technologist is performing a concrete test on a site. What minimum number of cylinders should the technologist make?
A) Four
B) Three
C) Five
D) One
Fragen und Antworten:
| 1. Frage Antwort: D | 2. Frage Antwort: A | 3. Frage Antwort: B | 4. Frage Antwort: D | 5. Frage Antwort: A |