SAP C_TS420_1709 Prüfungsthemen:
| Abschnitt | Gewichtung | Ziele |
|---|---|---|
| Thema 1: Kapazitätsplanung | 8 % – 12 % | - Kapazitätsauswertung
|
| Thema 2: Prozessaufträge | 8 % – 12 % | - Prozessfertigung
|
| Thema 3: Kanban | < 8 % | - Kanban-Steuerung
|
| Thema 4: Fertigungsaufträge | 12 % – 16 % | - Auftragsabwicklung
|
| Thema 5: Materialbedarfsplanung | 12 % – 16 % | - Durchführung der MRP
|
| Thema 6: Bedarfsplanung | 8 % – 12 % | - Unabhängige Planbedarfe
|
| Thema 7: Neuerungen im Fertigungsbereich von S/4HANA | < 8 % | - SAP Fiori und Analytik
|
| Thema 8: Stammdaten | 12 % – 16 % | - Fertigungsstammdaten
|
| Thema 9: Schlanke Fertigung und Serienfertigung | 8 % – 12 % | - Serienfertigung
|
| Thema 10: Chargenverwaltung | < 8 % | - Chargenbearbeitung
|
SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing (1709) C_TS420_1709 Prüfungsfragen mit Lösungen
On which of the following levels can you influence the availability check for the components of
production orders?
There are 2 correct answers to this question.
Response:
- A. Material master
- B. MRP controller
- C. Production order type
- D. Production controller
Antwort: A,B 🗳️
Which SAP solutions are part of the Digital Value Network portfolio?
There are 3 correct answers to this question.
Response:
- A. SAP Human Capital Management
- B. SAP Hybris
- C. SAP Fieldglass
- D. Concur
- E. SAP Visual Enterprise
Antwort: B,C,D 🗳️
Which functional capabilities does the Detailed Scheduling Board have?
There are 2 correct answers to this question.
Response:
- A. Change planned order quantities
- B. Enter time-ticket confirmation for production orders
- C. Undo for drag & Drop planning activities
- D. Change sales order quantities
Antwort: A,C 🗳️
What Kanban status automatically posts goods receipt with reference to the procurement element?
Please choose the correct answer.
Response:
- A. Wait
- B. In use
- C. Empty
- D. Full
Antwort: D 🗳️
Which material master setting is required to use the repetitive planning table for production with
production orders?
Please choose the correct answer.
Response:
- A. At least one valid production version must exist on the MRP4 view
- B. The Selection Method must be set to "2 Selection by production version".
- C. An overall profile be assigned on the Work Scheduling view
- D. A repetitive manufacturing profile must be assigned on the MRP4 view
Antwort: D 🗳️