ISQI CTAL-TM-UK Prüfungsthemen:
| Abschnitt | Ziele |
|---|---|
| Thema 1: Testmanagement-Prozess | - Tätigkeiten zum Abschluss der Testphase
|
| Thema 2: Verbesserung des Testprozesses | - Prozessbewertung und Prozessverbesserung
|
| Thema 3: Testwerkzeuge und Testautomatisierung | - Auswahl und Einführung von Testwerkzeugen
|
| Thema 4: Prüfungen | - Prüfungsablauf und Prüfungsmanagement
|
| Thema 5: Fehlermanagement | - Verwaltung des Fehlerlebenszyklus
|
| Thema 6: Testmanagement und Teststrategie | - Testverfahren und Ausrichtung am Entwicklungslebenszyklus
|
ISQI ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_UK) CTAL-TM-UK Prüfungsfragen mit Lösungen
Which of the following would be the most significant input to estimating the time to carry out the specified testing tasks? 3 credits
- A. The number of testers in the company and their grade.
- B. The metrics recorded from testing the capture-replay tool.
- C. The skills and experience of developers to correct the failures.
- D. The standards used for the requirements specification.
Antwort: B 🗳️
The introduction of reviews and inspections has often failed as a process improvement action. Identify the THREE most important measures that should be taken to reduce the risk that this test process improvement will fail. 2 Credits (for 2 out of 3 correct 1 credit)
- A. The availability of stands and processes
- B. Using a reference model, e.g. TMMi
- C. Management support
- D. Training of those involved
- E. Alignment with software process improvement
- F. Process ownership and experienced moderators who drive the inspection process.
- G. Usage of a more traditional software development lifecycle
Antwort: C,D,F 🗳️
Considerable attention will be given in this project to defining exit criteria and on reporting back on their status. Which combination of TWO exit criteria from the list would be best to use? 1 credit
I. Total number of defects found
II. Percentage of test cases executed
III. Total test effort planned versus total actual test effort spent
IV.
Defect trend (number of defects found per test run over time
- A. (i) and (iv)
- B. (ii) and (iii)
- C. (i) and (ii)
- D. (ii) and (iv)
Antwort: D 🗳️
Erklärung: (Nur für DeutschPrüfung-Mitglieder sichtbar)
As part of the improvement program, the organization is also looking at tool support. Which type of tool could be used to ensure higher quality of the code to be reviewed? 1 credit
- A. Test execution tool
- B. Review tool
- C. Static analysis tool
- D. Test design tool
Antwort: C 🗳️
Which of the following is NOT a typical key challenge for testing in a RAD based development approach? 1 credit
- A. Re-usable test scripts for (automated) regression testing
- B. Project management and control
- C. No complete requirements specification
- D. Time-boxing
Antwort: B 🗳️
Seite 1 von 13 wird angezeigt.
Fragen 1-5 von 65 werden angezeigt.






1271 Kundenbewertungen