SAP C-TS420-1809 Prüfungsthemen:
| Abschnitt | Gewichtung | Ziele |
|---|---|---|
| Prozessaufträge | 8% - 12% | - Prozessfertigung
|
| Kapazitätsplanung | 8% - 12% | - Kapazitätsmanagement
|
| Fertigungsaufträge | 12% - 16% | - Auftragsabwicklung
|
| Stammdaten in der Fertigung | 12% - 16% | - Fertigungsstammdaten
|
| Überwachung und Analytik | < 8% | - SAP Fiori und Berichtswesen
|
| Materialbedarfsplanung | 12% - 16% | - MRP-Verfahren
|
| Schlanke Fertigung | 8% - 12% | - Wiederholfertigung
|
| Integration der Produktionsplanung | 8% - 12% | - Funktionsübergreifende Integration
|
| Bedarfsmanagement | 8% - 12% | - Bedarfsplanung
|
SAP Certified Application Associate – SAP S/4HANA Production Planning and Manufacturing (1809) C-TS420-1809 Prüfungsfragen mit Lösungen
Frage #1
A warehouse manager likes to streamline the goods receipt (GR) process for production orders. Where can you enable the automatic GR?
There are 2 correct answers to this question.
Response:
A. Production scheduling profile
B. Confirmation profile
C. Scheduling margin key
D. Operation control key
Frage #2
Which times are used for Basic Date Scheduling of manufacturing planned orders in MRP?
There are 2 correct answers to this question.
Response:
A. Setup time
B. Float before and float after production
C. Opening period
D. Goods receipt processing time
Frage #3
Which elements are included in the structure of the batch where-used list?
There are 3 correct answers to this question.
Response:
A. Purchase orders
B. Transfers from batch to batch
C. Planned orders
D. Stock transfers
E. Collective orders
Frage #4
Which of the following functions can be performed when the production order has the status "Created" (CRTD)?
Please choose the correct answer.
Response:
A. A user trigger printing of shop floor paper manually (transaction CO02).
B. A user can schedule a background job to release production orders (transaction COOIS).
C. A user can trigger material staging via mass processing (transaction COHV).
D. A user trigger material availability check via mass processing (transaction COHV)
Frage #5
A customer is considering switching from order-related settlement to product-related settlement. What are capabilities of cost collectors?
There are 2 correct answers to this question.
Response:
A. They can be used for repetitive manufacturing.
B. They can be applied to make-to-stock production order.
C. They can be created automatically during month end process.
D. They can be used for manufacturing with collective orders.
Fragen und Antworten:
| Frage #1 Antwort: A,D | Frage #2 Antwort: A,B | Frage #3 Antwort: A,B,D | Frage #4 Antwort: A | Frage #5 Antwort: A,B |