SAP C-DBADM-2601 Prüfungsthemen:
| Abschnitt | Gewichtung | Ziele |
|---|---|---|
| Thema 1: SAP HANA Datenbankadministration | 12% | - Datenbankobjekte verwalten
|
| Thema 2: SAP HANA Systemadministration | 12% | - Systemwartung durchführen
|
| Thema 3: SAP HANA Installation und Konfiguration | 12% | - SAP HANA installieren
|
| Thema 4: SAP HANA Überwachung und Fehlerbehebung | 12% | - Fehlerbehebung
|
| Thema 5: SAP HANA Sicherheit | 12% | - Verwaltung von Benutzern und Rollen
|
| Thema 6: SAP HANA Backup und Recovery | 12% | - Durchführung von Recovery
|
| Thema 7: SAP HANA Hochverfügbarkeit und Disaster Recovery | 12% | - Disaster Recovery implementieren
|
| Thema 8: SAP HANA Leistungsoptimierung | 16% | - Systemleistung optimieren
|
SAP Certified - Database Administrator - SAP HANA C-DBADM-2601 Prüfungsfragen mit Lösungen
Frage #1
CHALLENGE 2 - Simulation Monitoring Baseline Control
The reporting team asks to apply memory-related tuning before the next baggage-volume simulation because response times varied during the first SIT cycle. The current monitoring baseline has not been fully captured. What should the database owner do first?
A. Move tuning decisions to the SAP HANA Cloud system because future analytics will run there.
B. Capture current monitoring behavior and validate threshold relevance before approving tuning.
C. Apply tuning immediately because faster simulation response time supports rollout confidence.
D. Disable simulation monitoring so the next run focuses only on report completion.
Frage #2
CHALLENGE 4 - Shipping-Cycle Recovery Evidence Gate
The upgraded distribution reporting system has recent backup completion evidence but no current recovery validation record. The installed validation database has a recovery test scheduled before cutover approval. Which interpretation is most accurate?
A. Recovery validation can be skipped because the systems are still in a rehearsal decision window.
B. The cutover package should distinguish backup completion from validated recoverability for each system.
C. The upgraded system can inherit recoverability evidence from the installed validation database.
D. Both systems have equivalent recoverability evidence because both are covered by backup scheduling.
Frage #3
A regional subscription meal company runs SAP HANA for delivery forecast analytics. SAP HANA cockpit shows normal database availability, but the operations team sees that a memory consumption graph has a gap during the nightly planning run. The alert log has no critical entry, yet planners reported slower dashboard response during that same interval. A support coordinator suggests lowering the memory alert threshold to catch the next occurrence.
The constraint is that the administrator must restore trustworthy monitoring evidence before changing alert sensitivity. The next planning run must allow the team to correlate workload behavior with memory evidence.
Which action best addresses the monitoring gap?
A. Ignore the graph gap because no critical alert was created and the database remained available.
B. Restart the database before the next planning run so the memory graph begins with a clean measurement baseline.
C. Verify and correct the memory metric collection path, monitor the next planning run, and validate that the graph captures the interval.
D. Lower the memory alert threshold so the next planning run produces a clearer alert.
Frage #4
CHALLENGE 4 - Release Recoverability Evidence Gate
The release lead can approve UAT sign-off on schedule using backup completion evidence, or delay briefly to include recovery validation for the UAT database and recoverability evidence for the upgraded system. Which path is most defensible?
A. Approve on schedule and attach recovery validation to the future SAP HANA Cloud migration plan.
B. Delay briefly to complete recoverability evidence for systems supporting the release package.
C. Cancel the release decision because recovery validation was not completed before UAT began.
D. Approve on schedule because meeting the release decision date is the strongest governance outcome.
Frage #5
CHALLENGE 4 - Recovery Validation Before Hypercare Closure
The team can either close hypercare on schedule with completed backup evidence or extend hypercare by one day to include recovery validation and startup behavior documentation. Which path is most defensible?
A. Cancel the planned cloud reporting transition because recovery validation is still pending.
B. Close hypercare and attach recovery validation to the later SAP HANA Cloud transition plan.
C. Extend hypercare by one day to include recovery validation and startup behavior evidence.
D. Close on schedule because meeting the hypercare date is the strongest governance outcome.