SAP Certified - Configuring SAP Ariba Strategic Sourcing Suite C_ACDET Prüfungsfragen mit Lösungen:
1. Which of the following applies in a greenfield deployment scenario when migrating configurations from your test site?
A) You can revert migrated configurations from the target site.
B) The status changes to Complete when migration is finished.
C) You cannot make other configuration updates in ICM when a migration operation is in progress.
D) if any configuration type fails during the migration process, you cannot create a new migration request.
2. You have a custom string field with a list of values. The values are represented as an Enumeration.
Which of the following applies to this scenario?
A) The user can filter the values using the search box in the chooser
B) The display order in the droop down matches the order defined in the enumeration file
C) In the enumeration file, the Value column must only contain whole numbers
D) The display order of the values is alphabetical
3. A Migration is performed for a Greenfield deployment to production, and the status of the Template configuration type indicates that it Failed. What actions do you take to make the failed template(s) available in production?
A) Import the template in production
B) Import the missing data in production and then import the template in production
C) Request SAP intervention
D) The template must always be rebuilt in production
4. Which scenarios are applicable when moving templates from the test site to the production site by ICM? Note: There are 2 correct answers to this question.
A) Draft templates on the source site are skipped.
B) Batch imports are available for templates when migrating configuration bundles.
C) Published templates with flex master data references in the test site are migrated to the production site during the first migration attempt.
D) New templates that successfully migrated to the production site are in Draft state.
5. During a Bluefield migration, you discover missing flex master data templates.
What do you do?
A) Use reporting workaround
B) Ignore them
C) Rebuild them manually in production
D) Defer to post-go-live
Fragen und Antworten:
| 1. Frage Antwort: B,C | 2. Frage Antwort: A,B | 3. Frage Antwort: B | 4. Frage Antwort: A,B | 5. Frage Antwort: C |






12 Kundenbewertungen

