SAP C-P2W43-2023 Prüfungsthemen:
| Abschnitt | Gewichtung | Ziele |
|---|---|---|
| Thema 1: Vorbeugende Wartung | 11–20 % | - Wartungspläne - Terminierung und Abrufe |
| Thema 2: Technische Objekte | 11–20 % | - Technische Plätze - Geräteverwaltung |
| Thema 3: Wartungsabwicklung | 21–30 % | - Erweiterte Wartungsfunktionen - Grundlegende Wartungsfunktionen |
| Thema 4: Wartungsabwicklung – Erweiterte Funktionen | 11–20 % | - Externe Bearbeitung und Dienstleistungen - Wartungsaufträge |
| Thema 5: Benutzeroberfläche und mobile Wartung | <=10 % | - Mobile Wartung (SAP Asset Manager) - SAP Fiori Apps für die Anlagenverwaltung |
| Thema 6: Organisationseinheiten und Stammdaten | <=10 % | |
| Thema 7: Verwaltung einer sauberen Systemarchitektur | <=10 % |
SAP Certified Associate - SAP S/4HANA Asset Management C-P2W43-2023 Prüfungsfragen mit Lösungen
Which capabilities does SAP Service and Asset Manager (formerly SAP Asset Manager) provide? Note: There are 3 correct answers to this question
- A. SAP Service and Asset Manager is available only for the iOS platform.
- B. SAP Service and Asset Manager provides single sign-on functionality.
- C. SAP Service and Asset Manager can run on smart watches.
- D. SAP Service and Asset Manager can be used offline.
- E. SAP Service and Asset Manager is available for SAP S/4HANA and SAP ERP
You schedule a Maintenance Service Plan. Which call object is generated?
- A. Maintenance Order which is linked to a Service Order Item
- B. Customer Service Order with assigned DIP profile
- C. Maintenance Order which is linked to a Service Order Header
- D. Customer Service Order with an external order operation
The planner adds stock materials in the maintenance order. What are possible options for handling of reservations within a maintenance order? Note: There are 2 correct answers to this question
- A. All open reservations are closed when the maintenance order is set to TECO.
- B. Open reservations can be cleared when a maintenance order operation is finally confirmed.
- C. For the combination of order type and planner group, you can decide when reservations are created
- D. Reservations are created only after a material availability check has been performed
What do you have to consider when setting up phase-based maintenance?
- A. It can be used with any existing order type.
- B. It is mandatory for breakdown and preventive maintenance.
- C. It comes preconfigured when using the relevant Best Practices scope items.
- D. It is not possible to configure the nine delivered phases.
Which are the prerequisites for Inspection Checklist Processing? Note: There are 2 correct answers to this question
- A. Classification data assigned to a technical object
- B. QM inspection plan with assigned inspection characteristics
- C. Inspection point type assigned to the task list header
- D. Master inspection characteristics assigned to PM task list operations