API Pipeline Construction Inspector API-1169 Prüfungsfragen mit Lösungen:
1. OSHA
A) American Society for Testing and Materials
B) Occupational Safety and Hazard Administration
C) Energy Star
D) Proposed Excavation
2. Oxygen deficiencies/excess are where oxygen levels are below______ or above _____.
A) 18.5% and 21.5%
B) 10.0% and 19.5%
C) 19.5% and 23.5%
D) 23.5% and 50.0%
3. Define FWPCA
A) Is the plan devise between the owner and crossing party to specify the details and provisions under which the crossing construction show occur. Depending on the size the nature of the crossing across and plan should be simple as an exchange of the mechanical requirements and an email agreement to follow these requirements. The more complex jobs the crossing plan should include topics such as cathodic protection requirements, a blasting plan (if any), support and backfill requirements, and erosion control.
B) Federal water pollution control act, a.k.a. clean water act
C) The quality policy(ISO 9000 3.5.8)
D) Specification for the quality management system of an organization.(ISO 9000 3.8.8)
4. Focused on providing confidence that quality requirements will be fulfilled.
A) Quality assurance
B) Total quality management
C) Quality improvement
D) Grading
5. Test medium temp instrument should be within ______ deg F of actual temp
A) 48
B) 18
C) 30
D) 1
Fragen und Antworten:
| 1. Frage Antwort: B | 2. Frage Antwort: C | 3. Frage Antwort: B | 4. Frage Antwort: A | 5. Frage Antwort: B |






1035 Kundenbewertungen